IAC Assessment: OK0474
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0474
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1995
Principal Product Pier systems
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 98,285
Annual Production 300 Pieces
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,907 599,062 kWh $0.06
Natural Gas $70,986 13,359 MMBtu $5.31
TOTAL ENERGY COSTS $104,893
RECOMMENDED SAVINGS* $11,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,314
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,457
Cost:
$4,457
- - $4,232 797 $225 - -
-
kWh
$4,232
797
MMBtu
$225
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$3,632
Cost:
$3,553
- - $3,632 684 - - -
-
kWh
$3,632
684
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,391
Cost:
$50
$1,391 26,084 - - - - $1,391
26,084
kWh
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,280
Cost:
$1,819
- - $1,280 241 - - -
-
kWh
$1,280
241
MMBtu
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$554
Cost:
-
$554 10,258 - - - - $554
10,258
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,314
Cost:
$9,879
$1,945 36,342 $9,144 1,722 $225 - $1,945
36,342
kWh
$9,144
1,722
MMBtu
$225
-
$
TOTAL IMPLEMENTED Savings:
$11,314
Cost:
$9,879
$1,945 36,342 $9,144 1,722 $225 - $1,945
36,342
kWh
$9,144
1,722
MMBtu
$225
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes