Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1996 |
Principal Product | Asphalt concrete hot mix |
NAICS | n/a |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $1,000,000-$5,000,000 |
# of Employees | 4 |
Plant Area (Sq.Ft.) | 5,000 |
Annual Production | 45,000 Tons |
Production Hrs. Annual | 4,000 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $16,485 | 230,950 | kWh | $0.07 |
Electricity Fees | $144 | - | $ | - |
Natural Gas | $84,597 | 56,850 | MMBtu | $1.49 |
TOTAL ENERGY COSTS | $101,226 | |||
RECOMMENDED SAVINGS* | $6,533 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,011 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,709 Cost: $3,419 |
- | - | $2,709 | 1,818 | - | - |
- - kWh |
$2,709 1,818 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $1,502 Cost: $500 |
- | - | $1,502 | 1,008 | - | - |
- - kWh |
$1,502 1,008 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $522 Cost: $468 |
$573 | 8,206 | $(-51) | (-34) | - | - |
$573 8,206 kWh |
$(-51) (-34) MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $1,800 Cost: - |
- | - | - | - | $1,800 | 1,200,000 |
- - kWh |
- - MMBtu |
$1,800 1,200,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,533 Cost: $4,387 |
$573 | 8,206 | $4,160 | 2,792 | $1,800 | 1,200,000 | $573 8,206 kWh |
$4,160 2,792 MMBtu |
$1,800 1,200,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,011 Cost: $3,919 |
- | - | $4,211 | 2,826 | $1,800 | 1,200,000 | - - kWh |
$4,211 2,826 MMBtu |
$1,800 1,200,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |