IAC Assessment: OK0504
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0504
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Custom plastic injection molding
NAICS n/a
SIC 3079 -
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 900,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,036 4,739,742 kWh $0.02
Electricity Demand $110,662 9,786 kW-months/year $11.31
Electricity Fees $3,949 - $ -
Natural Gas $8,518 1,522 MMBtu $5.60
TOTAL ENERGY COSTS $212,005
RECOMMENDED SAVINGS* $26,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,070
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)
$ kWh $ kW-months/year $ gal
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,551
Cost:
$800
- - - - $1,551 30 -
-
kWh
-
-
kW-months/year
$1,551
30
gal
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,093
Cost:
$5,400
- - $16,093 1,596 - - -
-
kWh
$16,093
1,596
kW-months/year
-
-
gal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,977
Cost:
$1,952
$5,977 324,736 - - - - $5,977
324,736
kWh
-
-
kW-months/year
-
-
gal
04: 2.2624 USE COLD WASTE WATER TO COOL CHILLER FEED WATER Savings:
$1,670
Cost:
$6,000
$967 52,462 $703 72 - - $967
52,462
kWh
$703
72
kW-months/year
-
-
gal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$464
Cost:
$2,440
$464 25,205 - - - - $464
25,205
kWh
-
-
kW-months/year
-
-
gal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$414
Cost:
$1,875
$414 22,567 - - - - $414
22,567
kWh
-
-
kW-months/year
-
-
gal
TOTAL RECOMMENDED Savings:
$26,169
Cost:
$18,467
$7,822 424,970 $16,796 1,668 $1,551 30 $7,822
424,970
kWh
$16,796
1,668
kW-months/year
$1,551
30
gal
TOTAL IMPLEMENTED Savings:
$22,070
Cost:
$7,352
$5,977 324,736 $16,093 1,596 - - $5,977
324,736
kWh
$16,093
1,596
kW-months/year
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)