IAC logo
IAC Assessment: OK0509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Pipe fittings and flanges
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 870,000
Annual Production 9,600 Tons
Production Hrs. Annual 5,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,078 3,804,807 kWh $0.05
Electricity Demand $768 9,290 kW-months/year $0.08
Natural Gas $377,203 157,737 MMBtu $2.39
TOTAL ENERGY COSTS $560,521
RECOMMENDED SAVINGS* $22,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,636
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ MMBtu $ gal $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,243
Cost:
-
- - $1,243 401 - - - - -
-
kWh
$1,243
401
MMBtu
-
-
gal
-
-
$
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$14,966
Cost:
$18,000
- - $11,066 4,628 - - $3,900 - -
-
kWh
$11,066
4,628
MMBtu
-
-
gal
$3,900
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,414
Cost:
$9,615
- - $2,414 647 - - - - -
-
kWh
$2,414
647
MMBtu
-
-
gal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,419
Cost:
$855
- - $2,419 472 - - - - -
-
kWh
$2,419
472
MMBtu
-
-
gal
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$470
Cost:
$460
$23 879 $447 187 - - - - $23
879
kWh
$447
187
MMBtu
-
-
gal
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$538
Cost:
$248
- - $538 130 - - - - -
-
kWh
$538
130
MMBtu
-
-
gal
-
-
$
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$600
Cost:
$6,901
- - - - $600 20,000 - - -
-
kWh
-
-
MMBtu
$600
20,000
gal
-
-
$
TOTAL RECOMMENDED Savings:
$22,650
Cost:
$36,079
$23 879 $18,127 6,465 $600 20,000 $3,900 - $23
879
kWh
$18,127
6,465
MMBtu
$600
20,000
gal
$3,900
-
$
TOTAL IMPLEMENTED Savings:
$19,636
Cost:
$19,563
$23 879 $15,713 5,818 - - $3,900 - $23
879
kWh
$15,713
5,818
MMBtu
-
-
gal
$3,900
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $
Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes