Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1996 |
Principal Product | Pipe fittings and flanges |
NAICS | n/a |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 870,000 |
Annual Production | 9,600 Tons |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $178,078 | 3,804,807 | kWh | $0.05 |
Electricity Demand | $768 | 9,290 | kW-months/year | $0.08 |
Natural Gas | $377,203 | 157,737 | MMBtu | $2.39 |
TOTAL ENERGY COSTS | $560,521 | |||
RECOMMENDED SAVINGS* | $22,650 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,636 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $1,243 Cost: - |
- | - | $1,243 | 401 | - | - | - | - |
- - kWh |
$1,243 401 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $14,966 Cost: $18,000 |
- | - | $11,066 | 4,628 | - | - | $3,900 | - |
- - kWh |
$11,066 4,628 MMBtu |
- - gal |
$3,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,414 Cost: $9,615 |
- | - | $2,414 | 647 | - | - | - | - |
- - kWh |
$2,414 647 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,419 Cost: $855 |
- | - | $2,419 | 472 | - | - | - | - |
- - kWh |
$2,419 472 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $470 Cost: $460 |
$23 | 879 | $447 | 187 | - | - | - | - |
$23 879 kWh |
$447 187 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $538 Cost: $248 |
- | - | $538 | 130 | - | - | - | - |
- - kWh |
$538 130 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE |
Savings: $600 Cost: $6,901 |
- | - | - | - | $600 | 20,000 | - | - |
- - kWh |
- - MMBtu |
$600 20,000 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,650 Cost: $36,079 |
$23 | 879 | $18,127 | 6,465 | $600 | 20,000 | $3,900 | - | $23 879 kWh |
$18,127 6,465 MMBtu |
$600 20,000 gal |
$3,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,636 Cost: $19,563 |
$23 | 879 | $15,713 | 5,818 | - | - | $3,900 | - | $23 879 kWh |
$15,713 5,818 MMBtu |
- - gal |
$3,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes |