IAC logo
IAC Assessment: OK0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Potato salad/ Baked beans
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 18,000 Tons
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,454 3,155,920 kWh $0.04
Electricity Demand $45,069 8,514 kW-months/year $5.29
Electricity Fees $924 - $ -
Natural Gas $82,223 27,666 MMBtu $2.97
TOTAL ENERGY COSTS $298,802
RECOMMENDED SAVINGS* $74,902 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,718
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$17,998
Cost:
$48,754
- - - - $17,998 6,060 - - - - -
-
kWh
-
-
kW-months/year
$17,998
6,060
MMBtu
-
-
lb
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,011
Cost:
$3,500
- - - - $6,011 2,024 - - - - -
-
kWh
-
-
kW-months/year
$6,011
2,024
MMBtu
-
-
lb
-
-
$
03: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$3,099
Cost:
$4,655
$(-135) (-4,689) - - $3,234 1,087 - - - - $(-135)
(-4,689)
kWh
-
-
kW-months/year
$3,234
1,087
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$962
Cost:
$114
$744 25,791 $218 50 - - - - - - $744
25,791
kWh
$218
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$747
Cost:
$166
- - - - $747 251 - - - - -
-
kWh
-
-
kW-months/year
$747
251
MMBtu
-
-
lb
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$6,149
Cost:
$12,500
- - - - - - $6,149 149,856 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,149
149,856
lb
-
-
$
07: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$39,936
Cost:
$28,000
- - - - - - - - $39,936 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$39,936
-
$
TOTAL RECOMMENDED Savings:
$74,902
Cost:
$97,689
$609 21,102 $218 50 $27,990 9,422 $6,149 149,856 $39,936 - $609
21,102
kWh
$218
50
kW-months/year
$27,990
9,422
MMBtu
$6,149
149,856
lb
$39,936
-
$
TOTAL IMPLEMENTED Savings:
$25,718
Cost:
$52,534
$744 25,791 $218 50 $24,756 8,335 - - - - $744
25,791
kWh
$218
50
kW-months/year
$24,756
8,335
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes