Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | Tickets |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 352 |
Plant Area (Sq.Ft.) | 175,000 |
Annual Production | 150,000,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $113,668 | 4,814,478 | kWh | $0.02 |
Electricity Demand | $50,684 | 11,806 | kW-months/year | $4.29 |
Electricity Fees | $3,564 | - | $ | - |
Natural Gas | $20,622 | 3,902 | MMBtu | $5.28 |
TOTAL ENERGY COSTS | $162,318 | |||
RECOMMENDED SAVINGS* | $72,096 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,964 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $732 Cost: $1,738 |
$732 | 31,067 | - | - | - | - | - | - |
$732 31,067 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $723 Cost: $10,000 |
$500 | 21,102 | $223 | 56 | - | - | - | - |
$500 21,102 kWh |
$223 56 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $62,400 Cost: $160,000 |
- | - | - | - | - | - | $62,400 | - |
- - kWh |
- - kW-months/year |
- - lb |
$62,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $171 Cost: $480 |
$69 | 2,931 | $17 | 4 | - | - | $85 | - |
$69 2,931 kWh |
$17 4 kW-months/year |
- - lb |
$85 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $8,070 Cost: $3,000 |
- | - | - | - | $8,070 | 38,800 | - | - |
- - kWh |
- - kW-months/year |
$8,070 38,800 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,096 Cost: $175,218 |
$1,301 | 55,100 | $240 | 60 | $8,070 | 38,800 | $62,485 | - | $1,301 55,100 kWh |
$240 60 kW-months/year |
$8,070 38,800 lb |
$62,485 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,964 Cost: $13,480 |
$569 | 24,033 | $240 | 60 | $8,070 | 38,800 | $85 | - | $569 24,033 kWh |
$240 60 kW-months/year |
$8,070 38,800 lb |
$85 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |