IAC Assessment: OK0545
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0545
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Meat pies, Chopped and formed meat patties, Entrees
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales n/a
# of Employees 155
Plant Area (Sq.Ft.) 50,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,253 6,422,919 kWh $0.03
Electricity Demand $31,289 - kW-months/year -
Natural Gas $232,237 63,559 MMBtu $3.65
TOTAL ENERGY COSTS $491,134
RECOMMENDED SAVINGS* $138,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,699
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$20,805
Cost:
$37,504
- - $20,805 7,300 - - - - - - -
-
kWh
$20,805
7,300
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,861
Cost:
$5,722
$(-376) (-13,189) $10,237 3,592 - - - - - - $(-376)
(-13,189)
kWh
$10,237
3,592
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$8,831
Cost:
$16,000
- - - - $8,831 43 - - - - -
-
kWh
-
-
MMBtu
$8,831
43
Tgal
-
-
$
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$68,169
Cost:
$15,000
- - - - - - $59,719 - $8,450 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$59,719
-
$
$8,450
-
$
05: 3.4155 METER WASTE WATER Savings:
$11,868
Cost:
-
- - - - $11,868 3,970,577 - - - - -
-
kWh
-
-
MMBtu
$11,868
3,970,577
Tgal
-
-
$
-
-
$
06: 3.4155 METER WASTE WATER Savings:
$18,725
Cost:
$39,000
- - - - - - $18,725 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$18,725
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$138,259
Cost:
$113,226
$(-376) (-13,189) $31,042 10,892 $20,699 3,970,620 $78,444 - $8,450 - $(-376)
(-13,189)
kWh
$31,042
10,892
MMBtu
$20,699
3,970,620
Tgal
$78,444
-
$
$8,450
-
$
TOTAL IMPLEMENTED Savings:
$20,699
Cost:
$16,000
- - - - $20,699 3,970,620 - - - - -
-
kWh
-
-
MMBtu
$20,699
3,970,620
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost