IAC logo
IAC Assessment: OK0556
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0556
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Edible Oils
NAICS n/a
SIC 2079 - Edible Fats And Oils, Nec
Sales $50,000,000-$100,000,000
# of Employees 73
Plant Area (Sq.Ft.) 400,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,480 8,810,375 kWh $0.02
Electricity Demand $161,320 2,233 kW-months/year $72.24
Electricity Fees $1,676 - $ -
Natural Gas $675,453 250,333 MMBtu $2.70
TOTAL ENERGY COSTS $1,050,929
RECOMMENDED SAVINGS* $204,826 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,889
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$75,726
Cost:
$9,000
- - - - $75,726 28,151 - - - - -
-
kWh
-
-
kW-months/year
$75,726
28,151
MMBtu
-
-
Tgal
-
-
lb
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$227
Cost:
$678
- - - - $227 84 - - - - -
-
kWh
-
-
kW-months/year
$227
84
MMBtu
-
-
Tgal
-
-
lb
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,303
Cost:
$500
$1,303 49,238 - - - - - - - - $1,303
49,238
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 3.4155 METER WASTE WATER Savings:
$119,889
Cost:
-
- - - - - - $119,889 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$119,889
-
Tgal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,048
Cost:
$3,000
$3,736 141,559 $2,312 272 - - - - - - $3,736
141,559
kWh
$2,312
272
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$633
Cost:
$1,020
$633 24,033 - - - - - - - - $633
24,033
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$1,000
Cost:
-
- - - - - - - - $1,000 24,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,000
24,000
lb
TOTAL RECOMMENDED Savings:
$204,826
Cost:
$14,198
$5,672 214,830 $2,312 272 $75,953 28,235 $119,889 - $1,000 24,000 $5,672
214,830
kWh
$2,312
272
kW-months/year
$75,953
28,235
MMBtu
$119,889
-
Tgal
$1,000
24,000
lb
TOTAL IMPLEMENTED Savings:
$78,889
Cost:
$11,198
$1,936 73,271 - - $75,953 28,235 - - $1,000 24,000 $1,936
73,271
kWh
-
-
kW-months/year
$75,953
28,235
MMBtu
-
-
Tgal
$1,000
24,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)