Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1998 |
Principal Product | Coatings |
NAICS | n/a |
SIC | 2851 - Paints And Allied Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 2,000 Thousand Gallons |
Production Hrs. Annual | 2,080 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $52,328 | 713,951 | kWh | $0.07 |
Natural Gas | $16,743 | 3,261 | MMBtu | $5.13 |
TOTAL ENERGY COSTS | $620,899 | |||
RECOMMENDED SAVINGS* | $251,630 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $203,444 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $43,625 Cost: $44,730 |
- | - | $43,625 | - | - | - | - | - |
- - kWh |
$43,625 - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,594 Cost: - |
$4,594 | 49,531 | - | - | - | - | - | - |
$4,594 49,531 kWh |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,561 Cost: $3,300 |
$4,561 | 62,134 | - | - | - | - | - | - |
$4,561 62,134 kWh |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $149,760 Cost: $280,000 |
- | - | - | - | - | - | $149,760 | - |
- - kWh |
- - Tgal |
- - gal |
$149,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1111 COVER INK CONTAINERS WHEN NOT IN USE |
Savings: $49,090 Cost: $5,700 |
- | - | - | - | $49,090 | 9,000 | - | - |
- - kWh |
- - Tgal |
$49,090 9,000 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $251,630 Cost: $333,730 |
$9,155 | 111,665 | $43,625 | - | $49,090 | 9,000 | $149,760 | - | $9,155 111,665 kWh |
$43,625 - Tgal |
$49,090 9,000 gal |
$149,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $203,444 Cost: $285,700 |
$4,594 | 49,531 | - | - | $49,090 | 9,000 | $149,760 | - | $4,594 49,531 kWh |
- - Tgal |
$49,090 9,000 gal |
$149,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Water Disposal | Other Liquid (non-haz) | Personnel Changes |