IAC logo
IAC Assessment: OK0562
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0562
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Powdered metal parts
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $5,000,000-$10,000,000
# of Employees 93
Plant Area (Sq.Ft.) 48,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,620 5,248,535 kWh $0.03
Electricity Demand $91,100 - kW-months/year -
Electricity Fees $8,002 - $ -
Natural Gas $27,693 4,544 MMBtu $6.09
TOTAL ENERGY COSTS $412,015
RECOMMENDED SAVINGS* $34,717 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,604
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ Tgal $ lb $ $
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$14,801
Cost:
$1,936
$14,801 328,253 - - - - - - - - $14,801
328,253
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,344
Cost:
$1,516
$1,344 29,894 - - - - - - - - $1,344
29,894
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$850
Cost:
$110
$850 29,894 - - - - - - - - $850
29,894
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$526
Cost:
$242
$526 34,291 - - - - - - - - $526
34,291
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$360
Cost:
$532
$360 12,603 - - - - - - - - $360
12,603
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$7,243
Cost:
-
- - $7,243 - - - - - - - -
-
kWh
$7,243
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$7,200
Cost:
$288
- - - - - - - - $7,200 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$7,200
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,160
Cost:
-
- - - - - - $2,160 9,600 - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$2,160
9,600
lb
-
-
$
09: 3.4155 METER WASTE WATER Savings:
$233
Cost:
-
- - - - $233 - - - - - -
-
kWh
-
-
MMBtu
$233
-
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$34,717
Cost:
$4,624
$17,881 434,935 $7,243 - $233 - $2,160 9,600 $7,200 - $17,881
434,935
kWh
$7,243
-
MMBtu
$233
-
Tgal
$2,160
9,600
lb
$7,200
-
$
TOTAL IMPLEMENTED Savings:
$25,604
Cost:
$2,866
$16,011 370,750 - - $233 - $2,160 9,600 $7,200 - $16,011
370,750
kWh
-
-
MMBtu
$233
-
Tgal
$2,160
9,600
lb
$7,200
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes