Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1998 |
Principal Product | Powdered metal parts |
NAICS | n/a |
SIC | 3462 - Iron And Steel Forgings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 93 |
Plant Area (Sq.Ft.) | 48,000 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $148,620 | 5,248,535 | kWh | $0.03 |
Electricity Demand | $91,100 | - | kW-months/year | - |
Electricity Fees | $8,002 | - | $ | - |
Natural Gas | $27,693 | 4,544 | MMBtu | $6.09 |
TOTAL ENERGY COSTS | $412,015 | |||
RECOMMENDED SAVINGS* | $34,717 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,604 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $14,801 Cost: $1,936 |
$14,801 | 328,253 | - | - | - | - | - | - | - | - |
$14,801 328,253 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,344 Cost: $1,516 |
$1,344 | 29,894 | - | - | - | - | - | - | - | - |
$1,344 29,894 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $850 Cost: $110 |
$850 | 29,894 | - | - | - | - | - | - | - | - |
$850 29,894 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $526 Cost: $242 |
$526 | 34,291 | - | - | - | - | - | - | - | - |
$526 34,291 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $360 Cost: $532 |
$360 | 12,603 | - | - | - | - | - | - | - | - |
$360 12,603 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $7,243 Cost: - |
- | - | $7,243 | - | - | - | - | - | - | - |
- - kWh |
$7,243 - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $7,200 Cost: $288 |
- | - | - | - | - | - | - | - | $7,200 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$7,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $2,160 Cost: - |
- | - | - | - | - | - | $2,160 | 9,600 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$2,160 9,600 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4155 METER WASTE WATER |
Savings: $233 Cost: - |
- | - | - | - | $233 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$233 - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,717 Cost: $4,624 |
$17,881 | 434,935 | $7,243 | - | $233 | - | $2,160 | 9,600 | $7,200 | - | $17,881 434,935 kWh |
$7,243 - MMBtu |
$233 - Tgal |
$2,160 9,600 lb |
$7,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,604 Cost: $2,866 |
$16,011 | 370,750 | - | - | $233 | - | $2,160 | 9,600 | $7,200 | - | $16,011 370,750 kWh |
- - MMBtu |
$233 - Tgal |
$2,160 9,600 lb |
$7,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |