IAC logo
IAC Assessment: OK0568
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0568
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Pressure vessels
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 25,000
Annual Production 120 Pieces
Production Hrs. Annual 6,084
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,633 658,558 kWh $0.07
Natural Gas $18,205 4,203 MMBtu $4.33
TOTAL ENERGY COSTS $71,329
RECOMMENDED SAVINGS* $59,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,760
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$233
Cost:
$731
$233 8,499 - - - - - - - - - - $233
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,682
Cost:
$2,748
- - $2,682 - - - - - - - - - -
-
kWh
$2,682
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,224
Cost:
-
- - - - - - - - - - $2,224 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$2,224
-
$
04: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$45,160
Cost:
$4,700
- - - - - - - - $45,160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$45,160
-
$
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,869
Cost:
$1,300
- - - - $6,869 1,586 - - - - - - -
-
kWh
-
-
kW-months/year
$6,869
1,586
MMBtu
-
-
gal
-
-
$
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,760
Cost:
$35,247
- - - - - - $2,760 500,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,760
500,000
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$59,928
Cost:
$44,726
$233 8,499 $2,682 - $6,869 1,586 $2,760 500,000 $45,160 - $2,224 - $233
8,499
kWh
$2,682
-
kW-months/year
$6,869
1,586
MMBtu
$2,760
500,000
gal
$45,160
-
$
$2,224
-
$
TOTAL IMPLEMENTED Savings:
$2,760
Cost:
$35,247
- - - - - - $2,760 500,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,760
500,000
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes