IAC logo
IAC Assessment: OK0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Miniature, incandescent, neon & light emitting diode lamps
NAICS n/a
SIC 3641 - Electric Lamps
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 30,000
Annual Production 80,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,045 1,477,433 kWh $0.04
Electricity Demand $22,950 - kW-months/year -
Natural Gas $15,584 3,139 MMBtu $4.96
TOTAL ENERGY COSTS $117,587
RECOMMENDED SAVINGS* $20,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,275
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,598
Cost:
$649
- - - - $3,598 484 - - - - -
-
kWh
-
-
kW-months/year
$3,598
484
MMBtu
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$615
Cost:
$130
$615 10,258 - - - - - - - - $615
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,735
Cost:
$1,689
$5,718 127,784 $2,017 246 - - - - - - $5,718
127,784
kWh
$2,017
246
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$372
Cost:
$387
$372 21,981 - - - - - - - - $372
21,981
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$782
Cost:
-
- - - - - - - - $782 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$782
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,160
Cost:
$10,828
- - - - - - $5,160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,160
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,160
Cost:
-
- - - - - - $2,160 86,400 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,160
86,400
lb
-
-
$
TOTAL RECOMMENDED Savings:
$20,422
Cost:
$13,683
$6,705 160,023 $2,017 246 $3,598 484 $7,320 86,400 $782 - $6,705
160,023
kWh
$2,017
246
kW-months/year
$3,598
484
MMBtu
$7,320
86,400
lb
$782
-
$
TOTAL IMPLEMENTED Savings:
$17,275
Cost:
$13,166
$5,718 127,784 $2,017 246 $3,598 484 $5,160 - $782 - $5,718
127,784
kWh
$2,017
246
kW-months/year
$3,598
484
MMBtu
$5,160
-
lb
$782
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes