IAC logo
IAC Assessment: OK0574
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0574
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Drilling Tools
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales n/a
# of Employees 300
Plant Area (Sq.Ft.) 240,000
Annual Production 23,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,532 14,842,321 kWh $0.03
Electricity Demand $182,863 - kW-months/year -
Electricity Fees $(-34,324) - $ -
Natural Gas $155,359 40,685 MMBtu $3.82
TOTAL ENERGY COSTS $824,370
RECOMMENDED SAVINGS* $150,623 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,541
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,785
Cost:
$300
$1,323 108,148 $3,462 208 - - - - - - $1,323
108,148
kWh
$3,462
208
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,381
Cost:
$2,100
$935 76,495 $2,446 147 - - - - - - $935
76,495
kWh
$2,446
147
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$934
Cost:
$1,524
$934 29,015 - - - - - - - - $934
29,015
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$129,375
Cost:
-
- - - - - - $129,375 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$129,375
-
$
-
-
$
05: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$6,000
Cost:
-
- - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$6,000
-
$
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$6,148
Cost:
$10,470
- - - - $6,148 - - - - - -
-
kWh
-
-
kW-months/year
$6,148
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$150,623
Cost:
$14,394
$3,192 213,658 $5,908 355 $6,148 - $129,375 - $6,000 - $3,192
213,658
kWh
$5,908
355
kW-months/year
$6,148
-
gal
$129,375
-
$
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$137,541
Cost:
$2,400
$2,258 184,643 $5,908 355 - - $129,375 - - - $2,258
184,643
kWh
$5,908
355
kW-months/year
-
-
gal
$129,375
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes