IAC logo
IAC Assessment: OK0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Shopping carts
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 386
Plant Area (Sq.Ft.) 510,000
Annual Production 450,000 Pieces
Production Hrs. Annual 5,640
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $375,486 18,164,127 kWh $0.02
Electricity Demand $384,703 - kW-months/year -
Natural Gas $231,533 78,980 MMBtu $2.93
TOTAL ENERGY COSTS $1,035,722
RECOMMENDED SAVINGS* $142,988 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,988
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,100
Cost:
$7,000
- - - - $8,100 2,765 - - - - -
-
kWh
-
-
kW-months/year
$8,100
2,765
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,117
Cost:
$6,500
$6,208 295,428 $6,909 650 - - - - - - $6,208
295,428
kWh
$6,909
650
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,681
Cost:
$1,000
$1,850 39,566 $831 174 - - - - - - $1,850
39,566
kWh
$831
174
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 3.6114 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE Savings:
$14,440
Cost:
$30,000
- - - - - - $14,440 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,440
-
lb
-
-
$
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$81,900
Cost:
$50,000
- - - - - - - - $81,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$81,900
-
$
06: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$22,750
Cost:
$50,000
- - - - - - - - $22,750 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$22,750
-
$
TOTAL RECOMMENDED Savings:
$142,988
Cost:
$144,500
$8,058 334,994 $7,740 824 $8,100 2,765 $14,440 - $104,650 - $8,058
334,994
kWh
$7,740
824
kW-months/year
$8,100
2,765
MMBtu
$14,440
-
lb
$104,650
-
$
TOTAL IMPLEMENTED Savings:
$52,988
Cost:
$87,500
$8,058 334,994 $7,740 824 - - $14,440 - $22,750 - $8,058
334,994
kWh
$7,740
824
kW-months/year
-
-
MMBtu
$14,440
-
lb
$22,750
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes