IAC Assessment: OK0596
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0596
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Tubes
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 200,000
Annual Production 70,000 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $356,028 14,338,804 kWh $0.02
Electricity Demand $190,662 31,890 kW-months/year $5.98
Natural Gas $930,521 295,682 MMBtu $3.15
TOTAL ENERGY COSTS $(-1,687,487)
RECOMMENDED SAVINGS* $138,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$299
Cost:
$1,360
$299 10,551 - - - - - - - - - - $299
10,551
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,864
Cost:
$345
$3,098 114,596 $766 128 - - - - - - - - $3,098
114,596
kWh
$766
128
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 4.1250 Savings:
$6,879
Cost:
-
- - - - - - - - - - $6,879 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$6,879
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$17,180
Cost:
$800
$12,917 520,223 $4,263 713 - - - - - - - - $12,917
520,223
kWh
$4,263
713
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,687
Cost:
$5,722
- - - - $4,687 4,358 - - - - - - -
-
kWh
-
-
kW-months/year
$4,687
4,358
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$17,603
Cost:
$6,000
- - - - - - $17,603 5,256,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,603
5,256,000
Tgal
-
-
$
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$87,600
Cost:
$110,000
- - - - - - - - $87,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$87,600
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$138,112
Cost:
$124,227
$16,314 645,370 $5,029 841 $4,687 4,358 $17,603 5,256,000 $87,600 - $6,879 - $16,314
645,370
kWh
$5,029
841
kW-months/year
$4,687
4,358
MMBtu
$17,603
5,256,000
Tgal
$87,600
-
$
$6,879
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes