IAC logo
IAC Assessment: OK0598
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0598
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Aviation Structural Components
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 44,500
Annual Production 2,000 Pieces
Production Hrs. Annual 5,460
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,141 1,259,209 kWh $0.05
Electricity Fees $1,183 - $ -
Natural Gas $3,238 498 MMBtu $6.50
TOTAL ENERGY COSTS $66,909
RECOMMENDED SAVINGS* $32,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,506
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$789
Cost:
$2,250
$789 16,417 - - - - $789
16,417
kWh
-
-
MMBtu
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,182
Cost:
$700
$2,182 45,428 - - - - $2,182
45,428
kWh
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$323
Cost:
$86
$323 6,741 - - - - $323
6,741
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$887
Cost:
$1,980
$887 18,464 - - - - $887
18,464
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$535
Cost:
$936
$181 3,810 $354 54 - - $181
3,810
kWh
$354
54
MMBtu
-
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$920
Cost:
$2,000
$920 19,343 - - - - $920
19,343
kWh
-
-
MMBtu
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$27,300
Cost:
$16,150
- - - - $27,300 - -
-
kWh
-
-
MMBtu
$27,300
-
$
TOTAL RECOMMENDED Savings:
$32,936
Cost:
$24,102
$5,282 110,203 $354 54 $27,300 - $5,282
110,203
kWh
$354
54
MMBtu
$27,300
-
$
TOTAL IMPLEMENTED Savings:
$3,506
Cost:
$3,886
$3,152 65,655 $354 54 - - $3,152
65,655
kWh
$354
54
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes