Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Prefabricated piping systems
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 100,000
Annual Production 8,100 Tons
Production Hrs. Annual 2,574
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,951 2,691,090 kWh $0.05
Electricity Fees $2,934 - $ -
Natural Gas $62,517 23,817 MMBtu $2.62
TOTAL ENERGY COSTS $495,757
RECOMMENDED SAVINGS* $542,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$15,427
Cost:
$10,600
- - - - - - $15,427 - - - -
-
kWh
-
-
MMBtu
-
-
$
$15,427
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$777
Cost:
$3,841
$777 16,413 - - - - - - - - $777
16,413
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,866
Cost:
$1,300
$6,866 166,764 - - - - - - - - $6,866
166,764
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$6,139
Cost:
$12,800
- - $6,139 1,709 - - - - - - -
-
kWh
$6,139
1,709
MMBtu
-
-
$
-
-
$
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$89,040
Cost:
-
- - - - - - - - $89,040 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$89,040
-
$
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$200,000
Cost:
$300,000
- - - - $200,000 - - - - - -
-
kWh
-
-
MMBtu
$200,000
-
$
-
-
$
-
-
$
07: 4.214 PURCHASE APPROPRIATELY SIZED MATERIAL Savings:
$224,052
Cost:
$150
- - - - $224,052 - - - - - -
-
kWh
-
-
MMBtu
$224,052
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$542,301
Cost:
$328,691
$7,643 183,177 $6,139 1,709 $424,052 - $15,427 - $89,040 - $7,643
183,177
kWh
$6,139
1,709
MMBtu
$424,052
-
$
$15,427
-
$
$89,040
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost