IAC Assessment: OK0601
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0601
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Oil well completion tools
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 147,550
Annual Production 0 Units
Production Hrs. Annual 5,430
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,340 1,710,727 kWh $0.03
Electricity Fees $34,408 - $ -
Natural Gas $14,749 1,319 MMBtu $11.18
TOTAL ENERGY COSTS $115,323
RECOMMENDED SAVINGS* $219,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,605
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes
$ kWh $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$684
Cost:
$3,500
$684 12,603 - - - - $684
12,603
kWh
-
-
lb
-
-
$
02: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$11,372
Cost:
$3,000
$11,372 207,210 - - - - $11,372
207,210
kWh
-
-
lb
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$17,881
Cost:
$5,000
$17,881 325,615 - - - - $17,881
325,615
kWh
-
-
lb
-
-
$
04: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$140,000
Cost:
$100,000
- - - - $140,000 - -
-
kWh
-
-
lb
$140,000
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$29,952
Cost:
-
- - - - $29,952 - -
-
kWh
-
-
lb
$29,952
-
$
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$14,040
Cost:
$35,000
- - - - $14,040 - -
-
kWh
-
-
lb
$14,040
-
$
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$5,829
Cost:
-
- - $5,829 228,600 - - -
-
kWh
$5,829
228,600
lb
-
-
$
TOTAL RECOMMENDED Savings:
$219,758
Cost:
$146,500
$29,937 545,428 $5,829 228,600 $183,992 - $29,937
545,428
kWh
$5,829
228,600
lb
$183,992
-
$
TOTAL IMPLEMENTED Savings:
$32,605
Cost:
$43,500
$18,565 338,218 - - $14,040 - $18,565
338,218
kWh
-
-
lb
$14,040
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes