IAC Assessment: OK0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Packaged Meat
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 125,000
Annual Production 114,000,000 Pounds
Production Hrs. Annual 5,400
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $340,803 12,544,000 kWh $0.03
Electricity Demand $26,681 4,356 kW-months/year $6.13
Electricity Fees $1,826 - $ -
Natural Gas $450,066 143,886 MMBtu $3.13
TOTAL ENERGY COSTS $1,142,482
RECOMMENDED SAVINGS* $66,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,830
Cost:
$200
$1,350 49,824 $480 78 - - $1,350
49,824
kWh
$480
78
kW-months/year
-
-
MMBtu
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$43,000
Cost:
$70,000
- - - - $43,000 11,550 -
-
kWh
-
-
kW-months/year
$43,000
11,550
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,130
Cost:
$10,700
- - - - $7,130 1,910 -
-
kWh
-
-
kW-months/year
$7,130
1,910
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,930
Cost:
$30,000
- - - - $14,930 4,000 -
-
kWh
-
-
kW-months/year
$14,930
4,000
MMBtu
TOTAL RECOMMENDED Savings:
$66,890
Cost:
$110,900
$1,350 49,824 $480 78 $65,060 17,460 $1,350
49,824
kWh
$480
78
kW-months/year
$65,060
17,460
MMBtu
TOTAL IMPLEMENTED Savings:
$1,830
Cost:
$200
$1,350 49,824 $480 78 - - $1,350
49,824
kWh
$480
78
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas