Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Asphalt
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $5,000,000-$10,000,000
# of Employees 15
Plant Area (Sq.Ft.) 400,000
Annual Production 200,000 Tons
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,499 946,261 kWh $0.07
Electricity Fees $2,063 - $ -
Natural Gas $358,603 101,671 MMBtu $3.53
TOTAL ENERGY COSTS $431,593
RECOMMENDED SAVINGS* $52,505 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $658
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Increase in Production Electricity Usage Natural Gas Personnel Changes Increase in Production
$ kWh $ MMBtu $ $ $ %
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$335
Cost:
$304
$335 4,563 - - - - - - $335
4,563
kWh
-
-
MMBtu
-
-
$
-
-
%
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$323
Cost:
$439
- - $323 75 - - - - -
-
kWh
$323
75
MMBtu
-
-
$
-
-
%
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$17,946
Cost:
$30,145
- - $17,946 4,171 - - - - -
-
kWh
$17,946
4,171
MMBtu
-
-
$
-
-
%
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$409
Cost:
$354
$409 5,576 - - - - - - $409
5,576
kWh
-
-
MMBtu
-
-
$
-
-
%
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,337
Cost:
$9,259
$8,337 113,579 - - - - - - $8,337
113,579
kWh
-
-
MMBtu
-
-
$
-
-
%
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$1,170
Cost:
$1,000
- - - - $1,170 - - - -
-
kWh
-
-
MMBtu
$1,170
-
$
-
-
%
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,985
Cost:
$27,632
- - $2,385 554 - - $21,600 - -
-
kWh
$2,385
554
MMBtu
-
-
$
$21,600
-
%
TOTAL RECOMMENDED Savings:
$52,505
Cost:
$69,133
$9,081 123,718 $20,654 4,800 $1,170 - $21,600 - $9,081
123,718
kWh
$20,654
4,800
MMBtu
$1,170
-
$
$21,600
-
%
TOTAL IMPLEMENTED Savings:
$658
Cost:
$743
$335 4,563 $323 75 - - - - $335
4,563
kWh
$323
75
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ $ $ %
Electricity Usage Natural Gas Personnel Changes Increase in Production Electricity Usage Natural Gas Personnel Changes Increase in Production