IAC logo
IAC Assessment: OK0624
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0624
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Winches
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 91,000
Annual Production 9,600 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,401 2,432,320 kWh $0.05
Electricity Fees $2,969 - $ -
Natural Gas $10,811 2,134 MMBtu $5.07
TOTAL ENERGY COSTS $209,453
RECOMMENDED SAVINGS* $344,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $140,111
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,978
Cost:
$130
$2,978 70,400 - - - - - - $2,978
70,400
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,484
Cost:
$255
$4,484 106,808 - - - - - - $4,484
106,808
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,627
Cost:
$240
$3,867 91,420 $760 15 - - - - $3,867
91,420
kWh
$760
15
kW-months/year
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,170
Cost:
$50,000
- - - - $1,170 - - - -
-
kWh
-
-
kW-months/year
$1,170
-
lb
-
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$131,000
Cost:
$92,000
- - - - - - $131,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$131,000
-
$
06: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$200,000
Cost:
$200,000
- - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$200,000
-
$
TOTAL RECOMMENDED Savings:
$344,259
Cost:
$342,625
$11,329 268,628 $760 15 $1,170 - $331,000 - $11,329
268,628
kWh
$760
15
kW-months/year
$1,170
-
lb
$331,000
-
$
TOTAL IMPLEMENTED Savings:
$140,111
Cost:
$92,495
$8,351 198,228 $760 15 - - $131,000 - $8,351
198,228
kWh
$760
15
kW-months/year
-
-
lb
$131,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes