Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2001 |
Principal Product | Carbide Drills and Inserts |
NAICS | n/a |
SIC | 3445 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 126 |
Plant Area (Sq.Ft.) | 52,000 |
Annual Production | 2,700,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $138,659 | 6,563,712 | kWh | $0.02 |
Electricity Demand | $54,164 | 12,750 | kW-months/year | $4.25 |
Electricity Fees | $76,896 | - | $ | - |
Natural Gas | $6,050 | 2,172 | MMBtu | $2.79 |
TOTAL ENERGY COSTS | $262,024 | |||
RECOMMENDED SAVINGS* | $105,619 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $102,977 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,900 Cost: $360 |
$2,210 | 104,675 | $890 | 209 | - | - | $(-200) | - | - | - | - | - |
$2,210 104,675 kWh |
$890 209 kW-months/year |
- - MMBtu |
$(-200) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,851 Cost: $84 |
$3,730 | 126,000 | $1,071 | 252 | - | - | - | - | - | - | $1,050 | - |
$3,730 126,000 kWh |
$1,071 252 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$1,050 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $376 Cost: $476 |
$376 | 17,280 | - | - | - | - | - | - | - | - | - | - |
$376 17,280 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $2,642 Cost: $1,408 |
- | - | - | - | $2,642 | 632 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,642 632 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $868 Cost: $230 |
$472 | 22,350 | $396 | 93 | - | - | - | - | - | - | - | - |
$472 22,350 kWh |
$396 93 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $39,782 Cost: $95,000 |
$28,358 | 1,344,000 | $11,424 | 2,688 | - | - | - | - | - | - | - | - |
$28,358 1,344,000 kWh |
$11,424 2,688 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $53,200 Cost: $30,400 |
- | - | - | - | - | - | $42,000 | - | $11,200 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$42,000 - $ |
$11,200 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,619 Cost: $127,958 |
$35,146 | 1,614,305 | $13,781 | 3,242 | $2,642 | 632 | $41,800 | - | $11,200 | - | $1,050 | - | $35,146 1,614,305 kWh |
$13,781 3,242 kW-months/year |
$2,642 632 MMBtu |
$41,800 - $ |
$11,200 - $ |
$1,050 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $102,977 Cost: $126,550 |
$35,146 | 1,614,305 | $13,781 | 3,242 | - | - | $41,800 | - | $11,200 | - | $1,050 | - | $35,146 1,614,305 kWh |
$13,781 3,242 kW-months/year |
- - MMBtu |
$41,800 - $ |
$11,200 - $ |
$1,050 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |