IAC logo
IAC Assessment: OK0632
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0632
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Package Buildings, Curtain Walls, Exterior Finishes
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 112,000
Annual Production 600 Thousand Feet
Production Hrs. Annual 1,300
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,029 734,925 kWh $0.07
Electricity Demand $84 - kW-months/year -
Electricity Fees $3,223 - $ -
Natural Gas $12,471 5,615 MMBtu $2.22
TOTAL ENERGY COSTS $69,711
RECOMMENDED SAVINGS* $59,957 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,460
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$130
Cost:
$500
$130 1,934 - - - - $130
1,934
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,867
Cost:
$250
- - $2,867 578 - - -
-
kWh
$2,867
578
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$451
Cost:
$2,456
- - $451 91 - - -
-
kWh
$451
91
MMBtu
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$936
Cost:
-
$936 14,040 - - - - $936
14,040
kWh
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,073
Cost:
$940
- - $1,773 358 $1,300 - -
-
kWh
$1,773
358
MMBtu
$1,300
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$11,700
Cost:
$2,112
- - - - $11,700 - -
-
kWh
-
-
MMBtu
$11,700
-
$
07: 4.426 MODIFY WORKLOAD Savings:
$1,800
Cost:
-
- - - - $1,800 - -
-
kWh
-
-
MMBtu
$1,800
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$19,500
Cost:
$2,500
- - - - $19,500 - -
-
kWh
-
-
MMBtu
$19,500
-
$
09: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$19,500
Cost:
$2,305
- - - - $19,500 - -
-
kWh
-
-
MMBtu
$19,500
-
$
TOTAL RECOMMENDED Savings:
$59,957
Cost:
$11,063
$1,066 15,974 $5,091 1,027 $53,800 - $1,066
15,974
kWh
$5,091
1,027
MMBtu
$53,800
-
$
TOTAL IMPLEMENTED Savings:
$37,460
Cost:
$8,008
$936 14,040 $2,224 449 $34,300 - $936
14,040
kWh
$2,224
449
MMBtu
$34,300
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes