IAC logo
IAC Assessment: OK0639
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0639
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Wiring Harnesses
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 333
Plant Area (Sq.Ft.) 140,000
Annual Production 2,000 Thousand Feet
Production Hrs. Annual 2,125
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,279 3,403,033 kWh $0.02
Electricity Demand $83,604 8,745 kW-months/year $9.56
Electricity Fees $(-5,324) - $ -
Natural Gas $8,553 1,201 MMBtu $7.12
TOTAL ENERGY COSTS $149,112
RECOMMENDED SAVINGS* $62,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,721
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,500
Cost:
-
$1,370 76,500 $4,130 432 - - - - $1,370
76,500
kWh
$4,130
432
kW-months/year
-
-
MMBtu
-
-
$
02: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$42,500
Cost:
$3,150
- - - - - - $42,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42,500
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$258
Cost:
$717
$258 14,391 - - - - - - $258
14,391
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,338
Cost:
$4,126
- - $1,338 240 - - - - -
-
kWh
$1,338
240
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,583
Cost:
$160
- - - - $6,583 700 - - -
-
kWh
-
-
kW-months/year
$6,583
700
MMBtu
-
-
$
06: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$6,380
Cost:
$14,226
$6,380 356,454 - - - - - - $6,380
356,454
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,559
Cost:
$22,379
$8,008 447,345 $5,468 672 $6,583 700 $42,500 - $8,008
447,345
kWh
$5,468
672
kW-months/year
$6,583
700
MMBtu
$42,500
-
$
TOTAL IMPLEMENTED Savings:
$18,721
Cost:
$15,103
$8,008 447,345 $4,130 432 $6,583 700 - - $8,008
447,345
kWh
$4,130
432
kW-months/year
$6,583
700
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes