IAC Assessment: OK0641
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0641
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Calcium Oxide
NAICS n/a
SIC 3274 - Lime
Sales $5,000,000-$10,000,000
# of Employees 51
Plant Area (Sq.Ft.) 0
Annual Production 361,200 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,307 13,998,600 kWh $0.04
Electricity Demand $106,029 3,500 kW-months/year $30.29
Electricity Fees $252 - $ -
Natural Gas $200,927 49,230 MMBtu $4.08
Coal $2,000,000 1,196,000 MMBtu $1.67
TOTAL ENERGY COSTS $2,823,675
RECOMMENDED SAVINGS* $331,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $194,258
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$49,032
Cost:
$32,834
$44,979 820,822 $4,053 1,110 - - - - - - - - $44,979
820,822
kWh
$4,053
1,110
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,658
Cost:
$238
- - - - $1,658 300 - - - - - - -
-
kWh
-
-
kW-months/year
$1,658
300
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$36,000
Cost:
$64,800
- - - - - - - - $36,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$36,000
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,661
Cost:
$8,000
$2,661 72,511 - - - - - - - - - - $2,661
72,511
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$265
Cost:
$350
$265 7,207 - - - - - - - - - - $265
7,207
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$47,600
Cost:
$71,935
- - - - - - $30,000 - - - $17,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,000
-
$
-
-
$
$17,600
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$194,258
Cost:
$42,750
- - - - $194,258 76,499 - - - - - - -
-
kWh
-
-
kW-months/year
$194,258
76,499
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$331,474
Cost:
$220,907
$47,905 900,540 $4,053 1,110 $195,916 76,799 $30,000 - $36,000 - $17,600 - $47,905
900,540
kWh
$4,053
1,110
kW-months/year
$195,916
76,799
MMBtu
$30,000
-
$
$36,000
-
$
$17,600
-
$
TOTAL IMPLEMENTED Savings:
$194,258
Cost:
$42,750
- - - - $194,258 76,499 - - - - - - -
-
kWh
-
-
kW-months/year
$194,258
76,499
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product