IAC Assessment: OK0643
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0643
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Fire Tube Boilers
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 80,000
Annual Production 250 Pieces
Production Hrs. Annual 2,600
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,281 760,560 kWh $0.03
Electricity Demand $13,749 - kW-months/year -
Electricity Fees $460 - $ -
Natural Gas $171,519 32,346 MMBtu $5.30
TOTAL ENERGY COSTS $212,209
RECOMMENDED SAVINGS* $183,780 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $128,268
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,635
Cost:
$558
- - - - $3,635 598 - - - - -
-
kWh
-
-
kW-months/year
$3,635
598
MMBtu
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,012
Cost:
$3,430
- - - - - - - - $2,012 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,012
-
$
03: 4.426 MODIFY WORKLOAD Savings:
$17,500
Cost:
$2,500
- - - - - - $17,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,500
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,163
Cost:
$1,440
- - - - $1,163 188 - - - - -
-
kWh
-
-
kW-months/year
$1,163
188
MMBtu
-
-
$
-
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$36,000
Cost:
$384
- - - - - - $36,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$36,000
-
$
-
-
$
06: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$117,500
Cost:
$4,800
- - - - - - $117,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$117,500
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,970
Cost:
$300
$4,870 149,733 $1,200 214 - - $(-100) - - - $4,870
149,733
kWh
$1,200
214
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$183,780
Cost:
$13,412
$4,870 149,733 $1,200 214 $4,798 786 $170,900 - $2,012 - $4,870
149,733
kWh
$1,200
214
kW-months/year
$4,798
786
MMBtu
$170,900
-
$
$2,012
-
$
TOTAL IMPLEMENTED Savings:
$128,268
Cost:
$7,098
$4,870 149,733 $1,200 214 $4,798 786 $117,400 - - - $4,870
149,733
kWh
$1,200
214
kW-months/year
$4,798
786
MMBtu
$117,400
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes