Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2002 |
Principal Product | Wheat Flour |
NAICS | n/a |
SIC | 2041 - Flour And Other Grain Mill Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 23 |
Plant Area (Sq.Ft.) | 21,000 |
Annual Production | 50,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $181,699 | 5,047,200 | kWh | $0.04 |
Electricity Demand | $72,924 | - | kW-months/year | - |
Electricity Fees | $61,163 | - | $ | - |
Natural Gas | $32,273 | 5,451 | MMBtu | $5.92 |
TOTAL ENERGY COSTS | $367,523 | |||
RECOMMENDED SAVINGS* | $30,914 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,633 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,976 Cost: $3,150 |
- | - | - | - | - | - | $1,976 | - | - | - |
- - kWh |
- - MMBtu |
- - $ |
$1,976 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $469 Cost: $93 |
- | - | $469 | 65 | - | - | - | - | - | - |
- - kWh |
$469 65 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $659 Cost: - |
- | - | - | - | - | - | $659 | - | - | - |
- - kWh |
- - MMBtu |
- - $ |
$659 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $13,960 Cost: - |
- | - | - | - | $(-1,040) | - | $15,000 | - | - | - |
- - kWh |
- - MMBtu |
$(-1,040) - $ |
$15,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $113 Cost: $60 |
$113 | 3,154 | - | - | - | - | - | - | - | - |
$113 3,154 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,858 Cost: $150 |
$2,258 | 62,735 | - | - | $(-200) | - | - | - | $(-200) | - |
$2,258 62,735 kWh |
- - MMBtu |
$(-200) - $ |
- - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,545 Cost: $5,270 |
- | - | $3,545 | 490 | - | - | - | - | - | - |
- - kWh |
$3,545 490 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $8,334 Cost: $9,000 |
- | - | $8,334 | 1,151 | - | - | - | - | - | - |
- - kWh |
$8,334 1,151 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,914 Cost: $17,723 |
$2,371 | 65,889 | $12,348 | 1,706 | $(-1,240) | - | $17,635 | - | $(-200) | - | $2,371 65,889 kWh |
$12,348 1,706 MMBtu |
$(-1,240) - $ |
$17,635 - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,633 Cost: $5,363 |
- | - | $4,014 | 555 | $(-1,040) | - | $15,659 | - | - | - | - - kWh |
$4,014 555 MMBtu |
$(-1,040) - $ |
$15,659 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |