IAC Assessment: OK0646
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0646
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Wheat Flour
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $10,000,000-$50,000,000
# of Employees 23
Plant Area (Sq.Ft.) 21,000
Annual Production 50,000 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,699 5,047,200 kWh $0.04
Electricity Demand $72,924 - kW-months/year -
Electricity Fees $61,163 - $ -
Natural Gas $32,273 5,451 MMBtu $5.92
TOTAL ENERGY COSTS $367,523
RECOMMENDED SAVINGS* $30,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,633
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,976
Cost:
$3,150
- - - - - - $1,976 - - - -
-
kWh
-
-
MMBtu
-
-
$
$1,976
-
$
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$469
Cost:
$93
- - $469 65 - - - - - - -
-
kWh
$469
65
MMBtu
-
-
$
-
-
$
-
-
$
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$659
Cost:
-
- - - - - - $659 - - - -
-
kWh
-
-
MMBtu
-
-
$
$659
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$13,960
Cost:
-
- - - - $(-1,040) - $15,000 - - - -
-
kWh
-
-
MMBtu
$(-1,040)
-
$
$15,000
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$113
Cost:
$60
$113 3,154 - - - - - - - - $113
3,154
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,858
Cost:
$150
$2,258 62,735 - - $(-200) - - - $(-200) - $2,258
62,735
kWh
-
-
MMBtu
$(-200)
-
$
-
-
$
$(-200)
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,545
Cost:
$5,270
- - $3,545 490 - - - - - - -
-
kWh
$3,545
490
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,334
Cost:
$9,000
- - $8,334 1,151 - - - - - - -
-
kWh
$8,334
1,151
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,914
Cost:
$17,723
$2,371 65,889 $12,348 1,706 $(-1,240) - $17,635 - $(-200) - $2,371
65,889
kWh
$12,348
1,706
MMBtu
$(-1,240)
-
$
$17,635
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$18,633
Cost:
$5,363
- - $4,014 555 $(-1,040) - $15,659 - - - -
-
kWh
$4,014
555
MMBtu
$(-1,040)
-
$
$15,659
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost