Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2002 |
Principal Product | Sucker and pony rods, couplings, pup joints, polished rods |
NAICS | n/a |
SIC | 3533 - Oil And Gas Field Machinery |
Sales | $5,000,000-$10,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 201,760 Pieces |
Production Hrs. Annual | 2,110 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $40,847 | 1,602,800 | kWh | $0.03 |
Electricity Demand | $34,698 | - | kW-months/year | - |
Electricity Fees | $3,600 | - | $ | - |
Natural Gas | $81,067 | 29,334 | MMBtu | $2.76 |
TOTAL ENERGY COSTS | $161,652 | |||
RECOMMENDED SAVINGS* | $419,970 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,060 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,956 Cost: $3,504 |
$2,623 | 87,448 | $1,333 | 497 | - | - | - | - | - | - |
$2,623 87,448 kWh |
$1,333 497 kW-months/year |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $104 Cost: $37 |
$76 | 2,543 | $28 | 127 | - | - | - | - | - | - |
$76 2,543 kWh |
$28 127 kW-months/year |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $16,238 Cost: $35,000 |
- | - | - | - | $16,238 | 4,018 | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,238 4,018 MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $1,706 Cost: $2,520 |
- | - | - | - | $1,706 | 422 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,706 422 MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.125 |
Savings: $397,966 Cost: $600,000 |
- | - | - | - | - | - | $193,450 | - | $204,516 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$193,450 - $ |
$204,516 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $419,970 Cost: $641,061 |
$2,699 | 89,991 | $1,361 | 624 | $17,944 | 4,440 | $193,450 | - | $204,516 | - | $2,699 89,991 kWh |
$1,361 624 kW-months/year |
$17,944 4,440 MMBtu |
$193,450 - $ |
$204,516 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,060 Cost: $3,541 |
$2,699 | 89,991 | $1,361 | 624 | - | - | - | - | - | - | $2,699 89,991 kWh |
$1,361 624 kW-months/year |
- - MMBtu |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Increase in Production |