IAC logo
IAC Assessment: OK0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Aircraft Engines - Service & Parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales >$500,000,000
# of Employees 240
Plant Area (Sq.Ft.) 400,000
Annual Production 1,200 Pieces
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,051 9,183,030 kWh $0.05
Electricity Fees $58,491 - $ -
Natural Gas $71,455 19,420 MMBtu $3.68
TOTAL ENERGY COSTS $579,103
RECOMMENDED SAVINGS* $93,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$10,706
Cost:
$5,000
$10,706 218,942 - - - - $10,706
218,942
kWh
-
-
$
-
-
MMBtu
02: 2.7122 DISCONNECT BALLASTS Savings:
$3,785
Cost:
$315
$3,547 72,533 $238 - - - $3,547
72,533
kWh
$238
-
$
-
-
MMBtu
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$56,437
Cost:
$28,000
$56,437 1,154,128 - - - - $56,437
1,154,128
kWh
-
-
$
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$16,663
Cost:
$1,000
$16,663 346,898 - - - - $16,663
346,898
kWh
-
-
$
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,285
Cost:
$2,340
- - - - $5,285 750 -
-
kWh
-
-
$
$5,285
750
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$659
Cost:
$659
$659 8,637 - - - - $659
8,637
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$93,535
Cost:
$37,314
$88,012 1,801,138 $238 - $5,285 750 $88,012
1,801,138
kWh
$238
-
$
$5,285
750
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas