Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | PVC hose, Tire patches, pneumatic hose fittings and assembly |
NAICS | 332912 - Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 106,000 |
Annual Production | 25 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $111,152 | 3,986,400 | kWh | $0.03 |
Electricity Demand | $63,107 | 7,175 | kW-months/year | $8.80 |
Electricity Fees | $7,042 | - | $ | - |
Natural Gas | $51,660 | 10,838 | MMBtu | $4.77 |
TOTAL ENERGY COSTS | $257,961 | |||
RECOMMENDED SAVINGS* | $249,430 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS |
Savings: $15,468 Cost: $30,000 |
- | - | $15,468 | 2,454 | - | - | - | - | - | - |
- - kWh |
$15,468 2,454 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $18,000 Cost: - |
- | - | - | - | - | - | $18,000 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$18,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $11,925 Cost: $1,200 |
- | - | $11,925 | 1,892 | - | - | - | - | - | - |
- - kWh |
$11,925 1,892 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $543 Cost: $404 |
$543 | 20,592 | - | - | - | - | - | - | - | - |
$543 20,592 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $4,253 Cost: $3,276 |
- | - | $4,253 | 675 | - | - | - | - | - | - |
- - kWh |
$4,253 675 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $4,844 Cost: $100 |
- | - | - | - | - | - | $4,844 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$4,844 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $136,157 Cost: $28,500 |
$(-12,643) | (-223,800) | - | - | $12,500 | 300,000 | $(-5,000) | - | $141,300 | - |
$(-12,643) (-223,800) kWh |
- - MMBtu |
$12,500 300,000 lb |
$(-5,000) - $ |
$141,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $58,240 Cost: $20,000 |
- | - | - | - | - | - | $58,240 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$58,240 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $249,430 Cost: $83,480 |
$(-12,100) | (-203,208) | $31,646 | 5,021 | $12,500 | 300,000 | $76,084 | - | $141,300 | - | $(-12,100) (-203,208) kWh |
$31,646 5,021 MMBtu |
$12,500 300,000 lb |
$76,084 - $ |
$141,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |