IAC logo
IAC Assessment: OK0666
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0666
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product PVC hose, Tire patches, pneumatic hose fittings and assembly
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 106,000
Annual Production 25 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,152 3,986,400 kWh $0.03
Electricity Demand $63,107 7,175 kW-months/year $8.80
Electricity Fees $7,042 - $ -
Natural Gas $51,660 10,838 MMBtu $4.77
TOTAL ENERGY COSTS $257,961
RECOMMENDED SAVINGS* $249,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$15,468
Cost:
$30,000
- - $15,468 2,454 - - - - - - -
-
kWh
$15,468
2,454
MMBtu
-
-
lb
-
-
$
-
-
$
02: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$18,000
Cost:
-
- - - - - - $18,000 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$18,000
-
$
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$11,925
Cost:
$1,200
- - $11,925 1,892 - - - - - - -
-
kWh
$11,925
1,892
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$543
Cost:
$404
$543 20,592 - - - - - - - - $543
20,592
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,253
Cost:
$3,276
- - $4,253 675 - - - - - - -
-
kWh
$4,253
675
MMBtu
-
-
lb
-
-
$
-
-
$
06: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$4,844
Cost:
$100
- - - - - - $4,844 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$4,844
-
$
-
-
$
07: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$136,157
Cost:
$28,500
$(-12,643) (-223,800) - - $12,500 300,000 $(-5,000) - $141,300 - $(-12,643)
(-223,800)
kWh
-
-
MMBtu
$12,500
300,000
lb
$(-5,000)
-
$
$141,300
-
$
08: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$58,240
Cost:
$20,000
- - - - - - $58,240 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$58,240
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$249,430
Cost:
$83,480
$(-12,100) (-203,208) $31,646 5,021 $12,500 300,000 $76,084 - $141,300 - $(-12,100)
(-203,208)
kWh
$31,646
5,021
MMBtu
$12,500
300,000
lb
$76,084
-
$
$141,300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material