IAC Assessment: OK0671
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0671
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Solid Tire and Rim Assemblies
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 300,000
Annual Production 4,934,754 Pounds
Production Hrs. Annual 2,860
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,701 2,010,720 kWh $0.05
Electricity Fees $12,948 - $ -
Natural Gas $98,161 25,450 MMBtu $3.86
TOTAL ENERGY COSTS $218,810
RECOMMENDED SAVINGS* $127,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,073
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Administrative Changes Water Consumption
$ kWh $ MMBtu $ $ $ $ $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,945
Cost:
$4,565
$2,305 43,003 - - $(-360) - - - - - $2,305
43,003
kWh
-
-
MMBtu
$(-360)
-
$
-
-
$
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,474
Cost:
$12,625
$3,002 56,000 - - - - $214 - $258 - $3,002
56,000
kWh
-
-
MMBtu
-
-
$
$214
-
$
$258
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$880
Cost:
$318
- - $880 228 - - - - - - -
-
kWh
$880
228
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$459
Cost:
$863
- - $459 119 - - - - - - -
-
kWh
$459
119
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,789
Cost:
$5,340
- - $1,789 105 - - - - - - -
-
kWh
$1,789
105
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,592
Cost:
$9,500
- - $4,592 1,191 - - - - - - -
-
kWh
$4,592
1,191
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$114,000
Cost:
$86,000
$(-6,498) (-121,225) $47,171 12,230 $74,880 - - - $(-1,553) - $(-6,498)
(-121,225)
kWh
$47,171
12,230
MMBtu
$74,880
-
$
-
-
$
$(-1,553)
-
Tgal
TOTAL RECOMMENDED Savings:
$127,139
Cost:
$119,211
$(-1,191) (-22,222) $54,891 13,873 $74,520 - $214 - $(-1,295) - $(-1,191)
(-22,222)
kWh
$54,891
13,873
MMBtu
$74,520
-
$
$214
-
$
$(-1,295)
-
Tgal
TOTAL IMPLEMENTED Savings:
$119,073
Cost:
$97,086
$(-4,193) (-78,222) $50,299 12,682 $74,520 - - - $(-1,553) - $(-4,193)
(-78,222)
kWh
$50,299
12,682
MMBtu
$74,520
-
$
-
-
$
$(-1,553)
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Natural Gas Personnel Changes Administrative Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Administrative Changes Water Consumption