Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product AC & DC Industrial Electric Motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 150,000
Annual Production 575,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,642 7,570,800 kWh $0.03
Electricity Demand $148,739 312,391 kW-months/year $0.48
Electricity Fees $43,857 - $ -
Natural Gas $107,936 13,281 MMBtu $8.13
TOTAL ENERGY COSTS $127,185
RECOMMENDED SAVINGS* $38,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$369
Cost:
$874
$369 18,439 - - - - - - $369
18,439
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,179
Cost:
$9,625
$1,577 78,877 $602 52 - - - - $1,577
78,877
kWh
$602
52
kW-months/year
-
-
$
-
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,300
Cost:
-
- - - - $5,300 - - - -
-
kWh
-
-
kW-months/year
$5,300
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,712
Cost:
$600
- - - - - - $3,712 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,712
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,578
Cost:
$242
- - - - - - $1,578 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,578
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$25,650
Cost:
$1,690
$5,018 250,918 $20,632 1,782 - - - - $5,018
250,918
kWh
$20,632
1,782
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,788
Cost:
$13,031
$6,964 348,234 $21,234 1,834 $5,300 - $5,290 - $6,964
348,234
kWh
$21,234
1,834
kW-months/year
$5,300
-
$
$5,290
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes