IAC logo
IAC Assessment: OK0690
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0690
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Ashphalt and Aggregates
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 1,000,000
Annual Production 2,650 Tons
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $341,473 7,098,148 kWh $0.05
Electricity Demand $41,710 49,927 kW-months/year $0.84
TOTAL ENERGY COSTS $383,183
RECOMMENDED SAVINGS* $125,325 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,325
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$38,252
Cost:
$21,080
$38,252 708,375 - - - - - - - - $38,252
708,375
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$292
Cost:
$706
$292 5,408 - - - - - - - - $292
5,408
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,316
Cost:
$400
- - - - - - $2,316 328 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,316
328
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,325
Cost:
$800
$5,189 96,096 $1,136 264 - - - - $2,000 - $5,189
96,096
kWh
$1,136
264
kW-months/year
-
-
$
-
-
MMBtu
$2,000
-
$
05: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,000
Cost:
-
- - - - - - - - $2,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,000
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$74,140
Cost:
$1,000
- - - - $74,140 - - - - - -
-
kWh
-
-
kW-months/year
$74,140
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$125,325
Cost:
$23,986
$43,733 809,879 $1,136 264 $74,140 - $2,316 328 $4,000 - $43,733
809,879
kWh
$1,136
264
kW-months/year
$74,140
-
$
$2,316
328
MMBtu
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$125,325
Cost:
$23,986
$43,733 809,879 $1,136 264 $74,140 - $2,316 328 $4,000 - $43,733
809,879
kWh
$1,136
264
kW-months/year
$74,140
-
$
$2,316
328
MMBtu
$4,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes