IAC Assessment: OK0691
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0691
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Walk-In Coolers and Freezers
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 47,000
Annual Production 600 Pieces
Production Hrs. Annual 2,600
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,299 604,097 kWh $0.05
Electricity Demand $10,329 1,957 kW-months/year $5.28
Electricity Fees $5,085 - $ -
Natural Gas $15,400 1,994 MMBtu $7.72
TOTAL ENERGY COSTS $60,113
RECOMMENDED SAVINGS* $370,565 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $280,157
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$90,154
Cost:
$5,782
- - - - $90,154 - -
-
kWh
-
-
MMBtu
$90,154
-
$
02: 4.623 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$270,439
Cost:
$2,825
- - - - $270,439 - -
-
kWh
-
-
MMBtu
$270,439
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,531
Cost:
$3,832
- - $6,531 846 - - -
-
kWh
$6,531
846
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,036
Cost:
$559
$2,228 49,896 - - $(-192) - $2,228
49,896
kWh
-
-
MMBtu
$(-192)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$265
Cost:
-
$265 5,460 - - - - $265
5,460
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$254
Cost:
$760
$254 5,242 - - - - $254
5,242
kWh
-
-
MMBtu
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$886
Cost:
$139
$886 12,461 - - - - $886
12,461
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$370,565
Cost:
$13,897
$3,633 73,059 $6,531 846 $360,401 - $3,633
73,059
kWh
$6,531
846
MMBtu
$360,401
-
$
TOTAL IMPLEMENTED Savings:
$280,157
Cost:
$7,355
$3,379 67,817 $6,531 846 $270,247 - $3,379
67,817
kWh
$6,531
846
MMBtu
$270,247
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes