Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2006 |
Principal Product | Roofing asphalt |
NAICS | 324122 - Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952 - Asphalt Felts And Coatings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 12 |
Plant Area (Sq.Ft.) | 326,700 |
Annual Production | 200,000 Tons |
Production Hrs. Annual | 6,318 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $58,649 | 1,554,720 | kWh | $0.04 |
Electricity Demand | $44,216 | 5,379 | kW-months/year | $8.22 |
Natural Gas | $375,129 | 54,936 | MMBtu | $6.83 |
TOTAL ENERGY COSTS | $481,616 | |||
RECOMMENDED SAVINGS* | $74,149 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,072 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $56,779 Cost: $157,975 |
- | - | - | - | $56,779 | 8,313 | - | - |
- - kWh |
- - kW-months/year |
$56,779 8,313 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $13,491 Cost: $550 |
- | - | - | - | $13,491 | 1,975 | - | - |
- - kWh |
- - kW-months/year |
$13,491 1,975 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,078 Cost: $1,637 |
- | - | - | - | $3,078 | 451 | - | - |
- - kWh |
- - kW-months/year |
$3,078 451 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $249 Cost: $1,098 |
- | - | - | - | $249 | 36 | - | - |
- - kWh |
- - kW-months/year |
$249 36 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $282 Cost: $80 |
$284 | 7,530 | $118 | 14 | - | - | $(-120) | - |
$284 7,530 kWh |
$118 14 kW-months/year |
- - MMBtu |
$(-120) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $221 Cost: $225 |
$221 | 5,862 | - | - | - | - | - | - |
$221 5,862 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $49 Cost: $92 |
$49 | 1,301 | - | - | - | - | - | - |
$49 1,301 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,149 Cost: $161,657 |
$554 | 14,693 | $118 | 14 | $73,597 | 10,775 | $(-120) | - | $554 14,693 kWh |
$118 14 kW-months/year |
$73,597 10,775 MMBtu |
$(-120) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,072 Cost: $2,492 |
$505 | 13,392 | $118 | 14 | $16,569 | 2,426 | $(-120) | - | $505 13,392 kWh |
$118 14 kW-months/year |
$16,569 2,426 MMBtu |
$(-120) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |