IAC Assessment: OK0728
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0728
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Ornamental fence
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 450,000
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $735,589 13,025,994 kWh $0.06
Electricity Demand $189,488 38,412 kW-months/year $4.93
Natural Gas $1,213,048 143,667 MMBtu $8.44
TOTAL ENERGY COSTS $2,138,125
RECOMMENDED SAVINGS* $134,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7314 REDUCE VENTILATION AIR Savings:
$35,971
Cost:
$12,184
- - $35,971 4,262 - - -
-
kWh
$35,971
4,262
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$75,048
Cost:
$240,000
- - $75,048 8,892 - - -
-
kWh
$75,048
8,892
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,567
Cost:
$34,652
- - $8,567 508 - - -
-
kWh
$8,567
508
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,034
Cost:
$1,994
$5,034 77,263 - - - - $5,034
77,263
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$506
Cost:
$430
$506 12,395 - - - - $506
12,395
kWh
-
-
MMBtu
-
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$6,517
Cost:
$2,295
- - $6,517 772 - - -
-
kWh
$6,517
772
MMBtu
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,500
Cost:
-
- - - - $2,500 - -
-
kWh
-
-
MMBtu
$2,500
-
$
TOTAL RECOMMENDED Savings:
$134,143
Cost:
$291,555
$5,540 89,658 $126,103 14,434 $2,500 - $5,540
89,658
kWh
$126,103
14,434
MMBtu
$2,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes