IAC logo
IAC Assessment: OK0735
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0735
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product meat products
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $5,000,000-$10,000,000
# of Employees 600
Plant Area (Sq.Ft.) 225,000
Annual Production 245,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $675,376 182,448,000 kWh $0.00
Electricity Demand $244,579 40,968 kW-months/year $5.97
Natural Gas $982,740 131,582 MMBtu $7.47
TOTAL ENERGY COSTS $1,902,695
RECOMMENDED SAVINGS* $122,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$69,788
Cost:
$55,933
- - $69,788 10,136 -
-
kWh
$69,788
10,136
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,821
Cost:
$9,500
- - $13,821 2,008 -
-
kWh
$13,821
2,008
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$29,625
Cost:
$4,000
- - $29,625 4,303 -
-
kWh
$29,625
4,303
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,193
Cost:
$12,830
$8,193 221,420 - - $8,193
221,420
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,240
Cost:
$700
- - $1,240 180 -
-
kWh
$1,240
180
MMBtu
TOTAL RECOMMENDED Savings:
$122,667
Cost:
$82,963
$8,193 221,420 $114,474 16,627 $8,193
221,420
kWh
$114,474
16,627
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas