IAC logo
IAC Assessment: OK0740
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0740
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product Iron castings
NAICS 331511 - Iron Foundries
SIC 3322 - Malleable Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 80,000
Annual Production 800,000 Pounds
Production Hrs. Annual 2,080
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,736 5,304,000 kWh $0.03
Electricity Demand $148,532 32,136 kW-months/year $4.62
Natural Gas $77,009 7,071 MMBtu $10.89
TOTAL ENERGY COSTS $362,374
RECOMMENDED SAVINGS* $32,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,981
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$19,199
Cost:
$3,579
$19,199 483,377 - - $19,199
483,377
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,981
Cost:
$360
$5,981 91,305 - - $5,981
91,305
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,861
Cost:
$34,620
- - $6,861 630 -
-
kWh
$6,861
630
MMBtu
TOTAL RECOMMENDED Savings:
$32,041
Cost:
$38,559
$25,180 574,682 $6,861 630 $25,180
574,682
kWh
$6,861
630
MMBtu
TOTAL IMPLEMENTED Savings:
$5,981
Cost:
$360
$5,981 91,305 - - $5,981
91,305
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas