IAC logo
IAC Assessment: OK0743
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0743
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product Flex package for meat products
NAICS 333993 - Packaging Machinery Manufacturing
SIC 3565 - Packaging Machinery
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 110,000
Annual Production 450 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,820 4,821,600 kWh $0.05
Electricity Demand $53,416 9,300 kW-months/year $5.74
Electricity Fees $19,159 - $ -
Natural Gas $24,345 1,858 MMBtu $13.10
TOTAL ENERGY COSTS $342,789
RECOMMENDED SAVINGS* $80,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,175
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,720
Cost:
$5,010
- - $22,720 1,300 -
-
kWh
$22,720
1,300
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,189
Cost:
$569
$2,189 42,486 - - $2,189
42,486
kWh
-
-
MMBtu
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$642
Cost:
$6,000
$642 12,960 - - $642
12,960
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,598
Cost:
$3,500
$3,598 72,701 - - $3,598
72,701
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$21,613
Cost:
$2,450
$21,613 436,626 - - $21,613
436,626
kWh
-
-
MMBtu
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$24,607
Cost:
-
$24,607 394,200 - - $24,607
394,200
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,413
Cost:
$723
$5,413 109,245 - - $5,413
109,245
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,782
Cost:
$18,252
$58,062 1,068,218 $22,720 1,300 $58,062
1,068,218
kWh
$22,720
1,300
MMBtu
TOTAL IMPLEMENTED Savings:
$56,175
Cost:
$18,252
$33,455 674,018 $22,720 1,300 $33,455
674,018
kWh
$22,720
1,300
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas