Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product Aerospace Metal Processing and Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales >$500,000,000
# of Employees 140
Plant Area (Sq.Ft.) 350,000
Annual Production 3,650,000 Pieces
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,524 3,773,600 kWh $0.06
Natural Gas $323,486 28,076 MMBtu $11.52
TOTAL ENERGY COSTS $691,419
RECOMMENDED SAVINGS* $101,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,937
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,664
Cost:
$3,013
- - $8,664 786 -
-
kWh
$8,664
786
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,523
Cost:
$559
$3,523 73,869 - - $3,523
73,869
kWh
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,835
Cost:
$6,840
$1,835 30,584 - - $1,835
30,584
kWh
-
-
MMBtu
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$22,448
Cost:
$2,495
- - $22,448 2,073 -
-
kWh
$22,448
2,073
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$22,467
Cost:
$1,029
- - $22,467 1,360 -
-
kWh
$22,467
1,360
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$34,710
Cost:
$1,002
- - $34,710 3,150 -
-
kWh
$34,710
3,150
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,337
Cost:
$8,477
- - $8,337 757 -
-
kWh
$8,337
757
MMBtu
TOTAL RECOMMENDED Savings:
$101,984
Cost:
$23,415
$5,358 104,453 $96,626 8,126 $5,358
104,453
kWh
$96,626
8,126
MMBtu
TOTAL IMPLEMENTED Savings:
$58,937
Cost:
$13,936
$5,358 104,453 $53,579 4,219 $5,358
104,453
kWh
$53,579
4,219
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas