IAC logo
IAC Assessment: OK0751
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0751
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product CELLULOSE INSULATION FIBER, INDUSTRIAL FIBER, AND EROSION CONTROL PRODUC
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2823 - Cellulosic Manmade Fibers
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 50,568
Annual Production 41,252,490 Pounds
Production Hrs. Annual 2,080
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,376 3,214,200 kWh $0.08
TOTAL ENERGY COSTS $266,376
RECOMMENDED SAVINGS* $64,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Fuel Oil #4 Personnel Changes Electricity Usage Fuel Oil #2 Fuel Oil #4 Personnel Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,572
Cost:
$2,401
$2,572 74,470 - - - - - - $2,572
74,470
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$59,692
Cost:
$201,700
$(-8,690) 108,618 $12,583 739 $1,719 85 $54,080 - $(-8,690)
108,618
kWh
$12,583
739
MMBtu
$1,719
85
MMBtu
$54,080
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,188
Cost:
$200
$2,188 - - - - - - - $2,188
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,452
Cost:
$204,301
$(-3,930) 183,088 $12,583 739 $1,719 85 $54,080 - $(-3,930)
183,088
kWh
$12,583
739
MMBtu
$1,719
85
MMBtu
$54,080
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Fuel Oil #2 Fuel Oil #4 Personnel Changes Electricity Usage Fuel Oil #2 Fuel Oil #4 Personnel Changes