Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2007 |
Principal Product | CELLULOSE INSULATION FIBER, INDUSTRIAL FIBER, AND EROSION CONTROL PRODUC |
NAICS | 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing |
SIC | 2823 - Cellulosic Manmade Fibers |
Sales | $5,000,000-$10,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 50,568 |
Annual Production | 41,252,490 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $266,376 | 3,214,200 | kWh | $0.08 |
TOTAL ENERGY COSTS | $266,376 | |||
RECOMMENDED SAVINGS* | $64,452 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Personnel Changes | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,572 Cost: $2,401 |
$2,572 | 74,470 | - | - | - | - | - | - |
$2,572 74,470 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $59,692 Cost: $201,700 |
$(-8,690) | 108,618 | $12,583 | 739 | $1,719 | 85 | $54,080 | - |
$(-8,690) 108,618 kWh |
$12,583 739 MMBtu |
$1,719 85 MMBtu |
$54,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $2,188 Cost: $200 |
$2,188 | - | - | - | - | - | - | - |
$2,188 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,452 Cost: $204,301 |
$(-3,930) | 183,088 | $12,583 | 739 | $1,719 | 85 | $54,080 | - | $(-3,930) 183,088 kWh |
$12,583 739 MMBtu |
$1,719 85 MMBtu |
$54,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Personnel Changes | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Personnel Changes |