IAC Assessment: OK0846
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0846
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2013
Principal Product Aircraft Parts
NAICS 336411 - Aircraft Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 206
Plant Area (Sq.Ft.) 213,220
Annual Production 100,000,000 Pieces
Production Hrs. Annual 3,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $319,909 10,328,149 kWh $0.03
Electricity Demand $227,339 23,567 kW-months/year $9.65
Natural Gas $49,415 8,658 MMBtu $5.71
TOTAL ENERGY COSTS $596,663
RECOMMENDED SAVINGS* $55,488 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,051
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,801
Cost:
$9,541
$1,249 40,284 $1,552 161 - - - - $1,249
40,284
kWh
$1,552
161
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,561
Cost:
$525
$1,561 50,355 - - - - - - $1,561
50,355
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,618
Cost:
$31,000
$1,618 52,180 - - - - - - $1,618
52,180
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$7,018
Cost:
$8,775
$7,018 226,375 - - - - - - $7,018
226,375
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,467
Cost:
$13,650
$1,491 48,086 $976 101 - - - - $1,491
48,086
kWh
$976
101
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,061
Cost:
$3,840
$1,285 41,457 $1,206 125 - - $2,570 450 $1,285
41,457
kWh
$1,206
125
kW-months/year
-
-
$
$2,570
450
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$32,267
Cost:
$17,174
- - - - $32,267 - - - -
-
kWh
-
-
kW-months/year
$32,267
-
$
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,202
Cost:
$862
- - - - - - $2,202 386 -
-
kWh
-
-
kW-months/year
-
-
$
$2,202
386
MMBtu
09: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$493
Cost:
$413
$493 15,894 - - - - - - $493
15,894
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,488
Cost:
$85,780
$14,715 474,631 $3,735 387 $32,267 - $4,772 836 $14,715
474,631
kWh
$3,735
387
kW-months/year
$32,267
-
$
$4,772
836
MMBtu
TOTAL IMPLEMENTED Savings:
$44,051
Cost:
$36,464
$4,830 155,792 $2,183 226 $32,267 - $4,772 836 $4,830
155,792
kWh
$2,183
226
kW-months/year
$32,267
-
$
$4,772
836
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas