IAC logo
IAC Assessment: OK0890
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0890
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Aluminum and steel toolboxes
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 325,000
Annual Production 240,000 Pieces
Production Hrs. Annual 3,250
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,598 5,602,800 kWh $0.05
Electricity Demand $92,965 20,891 kW-months/year $4.45
Natural Gas $344,425 63,619 MMBtu $5.41
LPG $29,037 1,408 MMBtu $20.62
TOTAL ENERGY COSTS $722,025
RECOMMENDED SAVINGS* $62,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$9,580
Cost:
$770
$(-6,257) (-137,214) - - - - $29,037 940 $(-13,200) - $(-6,257)
(-137,214)
kWh
-
-
kW-months/year
-
-
MMBtu
$29,037
940
MMBtu
$(-13,200)
-
$
02: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$8,687
Cost:
$4,800
$6,065 133,000 $2,622 589 - - - - - - $6,065
133,000
kWh
$2,622
589
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$1,460
Cost:
$1,200
$1,460 32,000 - - - - - - - - $1,460
32,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,200
Cost:
-
$1,200 26,400 - - - - - - - - $1,200
26,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$6,400
Cost:
$1,230
- - - - $6,400 1,183 - - - - -
-
kWh
-
-
kW-months/year
$6,400
1,183
MMBtu
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,700
Cost:
-
- - - - $4,700 875 - - - - -
-
kWh
-
-
kW-months/year
$4,700
875
MMBtu
-
-
MMBtu
-
-
$
07: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$30,394
Cost:
$1,000
$1,044 22,900 - - $29,349 5,415 - - - - $1,044
22,900
kWh
-
-
kW-months/year
$29,349
5,415
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,420
Cost:
$9,000
$3,512 77,086 $2,622 589 $40,449 7,473 $29,037 940 $(-13,200) - $3,512
77,086
kWh
$2,622
589
kW-months/year
$40,449
7,473
MMBtu
$29,037
940
MMBtu
$(-13,200)
-
$
TOTAL IMPLEMENTED Savings:
$51,380
Cost:
$7,030
$8,309 182,300 $2,622 589 $40,449 7,473 - - - - $8,309
182,300
kWh
$2,622
589
kW-months/year
$40,449
7,473
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes