IAC logo
IAC Assessment: OK0919
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0919
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2015
Principal Product Asphalt based roof coatings
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 106,500
Annual Production 8,065 Thousand Gallons
Production Hrs. Annual 2,860
Location (State) TX
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,967 657,274 kWh $0.13
Natural Gas $134,252 42,078 MMBtu $3.19
TOTAL ENERGY COSTS $229,724
RECOMMENDED SAVINGS* $31,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,346
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$758
Cost:
$1,688
$758 5,783 - - $758
5,783
kWh
-
-
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,030
Cost:
$1,790
$2,030 15,494 - - $2,030
15,494
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$815
Cost:
$3,390
$815 6,220 - - $815
6,220
kWh
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,498
Cost:
$3,000
- - $4,498 1,410 -
-
kWh
$4,498
1,410
MMBtu
05: 2.1224 REPLACE BOILER Savings:
$10,468
Cost:
$22,000
- - $10,468 3,282 -
-
kWh
$10,468
3,282
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$435
Cost:
$600
- - $435 137 -
-
kWh
$435
137
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,213
Cost:
$6,000
- - $4,213 1,321 -
-
kWh
$4,213
1,321
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,725
Cost:
$2,000
- - $2,725 854 -
-
kWh
$2,725
854
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,124
Cost:
$5,120
- - $3,124 979 -
-
kWh
$3,124
979
MMBtu
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,991
Cost:
$100
$1,583 12,086 $408 128 $1,583
12,086
kWh
$408
128
MMBtu
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$208
Cost:
$210
$208 1,591 - - $208
1,591
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$31,266
Cost:
$45,898
$5,394 41,174 $25,872 8,110 $5,394
41,174
kWh
$25,872
8,110
MMBtu
TOTAL IMPLEMENTED Savings:
$14,346
Cost:
$15,898
$3,156 24,089 $11,190 3,508 $3,156
24,089
kWh
$11,190
3,508
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas