IAC logo
IAC Assessment: OK1020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Sausage and other prepared meat products
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 596
Plant Area (Sq.Ft.) 112,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 6,084
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,511,900 38,276,400 kWh $0.04
Electricity Demand $1,633,800 94,603 kW-months/year $17.27
Electricity Fees $94,749 - $ -
Natural Gas $332,318 82,252 MMBtu $4.04
TOTAL ENERGY COSTS $3,572,767
RECOMMENDED SAVINGS* $510,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$164,531
Cost:
-
- - - - $164,531 - - - -
-
kWh
-
-
kW-months/year
$164,531
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$91,270
Cost:
$50,570
- - - - $91,270 - - - -
-
kWh
-
-
kW-months/year
$91,270
-
$
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$111,877
Cost:
$100,000
$111,877 2,832,338 - - - - - - $111,877
2,832,338
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$84,978
Cost:
$73,560
$84,978 2,151,344 - - - - - - $84,978
2,151,344
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$33,536
Cost:
$500
- - - - - - $33,536 8,301 -
-
kWh
-
-
kW-months/year
-
-
$
$33,536
8,301
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,990
Cost:
-
$19,990 506,065 - - - - - - $19,990
506,065
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,410
Cost:
$1,270
$2,758 69,817 $1,652 96 - - - - $2,758
69,817
kWh
$1,652
96
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$510,592
Cost:
$225,900
$219,603 5,559,564 $1,652 96 $255,801 - $33,536 8,301 $219,603
5,559,564
kWh
$1,652
96
kW-months/year
$255,801
-
$
$33,536
8,301
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas