Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2022 |
Principal Product | Bottled tea and lemonade |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 167 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 907 Thousand Gallons |
Production Hrs. Annual | 8,736 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,056 | 4,925,700 | kWh | $0.08 |
Natural Gas | $84,606 | 9,277 | MMBtu | $9.12 |
TOTAL ENERGY COSTS | $766,916 | |||
RECOMMENDED SAVINGS* | $449,589 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,650 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,650 Cost: - |
$3,650 | 45,619 | - | - | - | - | - | - |
$3,650 45,619 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,749 Cost: - |
- | - | - | - | $6,749 | 740 | - | - |
- - kWh |
- - $ |
$6,749 740 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $439 Cost: $2,000 |
- | - | $439 | - | - | - | - | - |
- - kWh |
$439 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8117 INSTALL SUB-METERING EQUIPMENT |
Savings: $173,223 Cost: $1,272 |
- | - | - | - | - | - | $173,223 | - |
- - kWh |
- - $ |
- - MMBtu |
$173,223 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $265,528 Cost: $1,357,737 |
$265,528 | 3,319,098 | - | - | - | - | - | - |
$265,528 3,319,098 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $449,589 Cost: $1,361,009 |
$269,178 | 3,364,717 | $439 | - | $6,749 | 740 | $173,223 | - | $269,178 3,364,717 kWh |
$439 - $ |
$6,749 740 MMBtu |
$173,223 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,650 Cost: - |
$3,650 | 45,619 | - | - | - | - | - | - | $3,650 45,619 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost |