IAC logo
IAC Assessment: OK1148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2025
Principal Product HVAC filters
NAICS 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 451,400
Annual Production 10,000,000 Units
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,600 1,908,400 kWh $0.05
Electricity Demand $70,491 5,810 kW-months/year $12.13
Natural Gas $21,433 2,408 MMBtu $8.90
TOTAL ENERGY COSTS $192,692
RECOMMENDED SAVINGS* $36,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$17,296
Cost:
$210,600
$17,296 339,136 - - - - $17,296
339,136
kWh
-
-
MMBtu
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,185
Cost:
$18,260
$2,185 42,834 - - - - $2,185
42,834
kWh
-
-
MMBtu
-
-
$
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$3,106
Cost:
$5,620
$3,106 60,907 - - - - $3,106
60,907
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,698
Cost:
$7,800
- - $7,698 864 - - -
-
kWh
$7,698
864
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,237
Cost:
$115
$1,237 24,257 - - - - $1,237
24,257
kWh
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,079
Cost:
$5,115
$3,079 60,363 - - - - $3,079
60,363
kWh
-
-
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,256
Cost:
$2,941
- - - - $2,256 - -
-
kWh
-
-
MMBtu
$2,256
-
$
TOTAL RECOMMENDED Savings:
$36,857
Cost:
$250,451
$26,903 527,497 $7,698 864 $2,256 - $26,903
527,497
kWh
$7,698
864
MMBtu
$2,256
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes