Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1995 |
Principal Product | prepared salads |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 7,695,000 Pounds |
Production Hrs. Annual | 5,424 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $73,912 | 1,136,870 | kWh | $0.07 |
Natural Gas | $21,144 | 4,865 | MMBtu | $4.35 |
TOTAL ENERGY COSTS | $95,056 | |||
RECOMMENDED SAVINGS* | $17,088 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,689 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,029 Cost: $40 |
$2,029 | 28,136 | - | - | - | - | - | - |
$2,029 28,136 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $660 Cost: $1,000 |
- | - | $660 | 160 | - | - | - | - |
- - kWh |
$660 160 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $994 Cost: $2,600 |
$994 | - | - | - | - | - | - | - |
$994 - kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $463 Cost: - |
- | - | - | - | $463 | 86 | - | - |
- - kWh |
- - MMBtu |
$463 86 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) |
Savings: $12,942 Cost: $1,372 |
- | - | - | - | - | - | $12,942 | 346,400 |
- - kWh |
- - MMBtu |
- - Tgal |
$12,942 346,400 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,088 Cost: $5,012 |
$3,023 | 28,136 | $660 | 160 | $463 | 86 | $12,942 | 346,400 | $3,023 28,136 kWh |
$660 160 MMBtu |
$463 86 Tgal |
$12,942 346,400 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,689 Cost: $1,040 |
$2,029 | 28,136 | $660 | 160 | - | - | - | - | $2,029 28,136 kWh |
$660 160 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) |