IAC logo
IAC Assessment: OR0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product nameplates
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 360
Plant Area (Sq.Ft.) 35,000
Annual Production 0 Units
Production Hrs. Annual 7,344
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,197 4,604,631 kWh $0.04
Natural Gas $31,513 5,630 MMBtu $5.60
TOTAL ENERGY COSTS $241,280
RECOMMENDED SAVINGS* $27,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $474
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Other Liquid (haz) Electricity Usage Natural Gas Other Liquid (non-haz) Other Liquid (haz)
$ kWh $ MMBtu $ gal $ gal
01: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$10,209
Cost:
-
- - - - $10,209 - - - -
-
kWh
-
-
MMBtu
$10,209
-
gal
-
-
gal
02: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$8,328
Cost:
$250
- - - - - - $8,328 1,040 -
-
kWh
-
-
MMBtu
-
-
gal
$8,328
1,040
gal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,459
Cost:
$1,422
- - $1,459 277 - - - - -
-
kWh
$1,459
277
MMBtu
-
-
gal
-
-
gal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$474
Cost:
$1,045
- - $474 90 - - - - -
-
kWh
$474
90
MMBtu
-
-
gal
-
-
gal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,487
Cost:
$5,740
- - $2,487 472 - - - - -
-
kWh
$2,487
472
MMBtu
-
-
gal
-
-
gal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,496
Cost:
$20,400
$4,496 - - - - - - - $4,496
-
kWh
-
-
MMBtu
-
-
gal
-
-
gal
TOTAL RECOMMENDED Savings:
$27,453
Cost:
$28,857
$4,496 - $4,420 839 $10,209 - $8,328 1,040 $4,496
-
kWh
$4,420
839
MMBtu
$10,209
-
gal
$8,328
1,040
gal
TOTAL IMPLEMENTED Savings:
$474
Cost:
$1,045
- - $474 90 - - - - -
-
kWh
$474
90
MMBtu
-
-
gal
-
-
gal
Savings
Cost
$ kWh $ MMBtu $ gal $ gal
Electricity Usage Natural Gas Other Liquid (non-haz) Other Liquid (haz) Electricity Usage Natural Gas Other Liquid (non-haz) Other Liquid (haz)