IAC Assessment: OR0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Plastic bottles and preforms
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 320,000
Annual Production 67,454,484 Pounds
Production Hrs. Annual 8,736
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,441,203 48,791,912 kWh $0.03
Electricity Demand $408,589 92,531 kW-months/year $4.42
Electricity Fees $20,020 - $ -
LPG $4,194 549 MMBtu $7.64
TOTAL ENERGY COSTS $1,990,932
RECOMMENDED SAVINGS* $328,492 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,384
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$173,800
Cost:
$84,400
- - - - - - $(-8,400) 554,000 - - $182,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-8,400)
554,000
lb
-
-
$
$182,200
-
$
02: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$107,110
Cost:
$303,860
$(-1,010) (-33,998) $(-420) (-95) - - - - $108,540 - - - $(-1,010)
(-33,998)
kWh
$(-420)
(-95)
kW-months/year
-
-
$
-
-
lb
$108,540
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,050
Cost:
$24,750
$(-40) (-1,465) $(-590) (-134) - - $7,680 - - - - - $(-40)
(-1,465)
kWh
$(-590)
(-134)
kW-months/year
-
-
$
$7,680
-
lb
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$12,200
Cost:
$2,450
$12,200 412,075 - - - - - - - - - - $12,200
412,075
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,184
Cost:
$16,818
$7,498 253,810 $1,686 383 - - - - - - - - $7,498
253,810
kWh
$1,686
383
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,148
Cost:
$101,000
- - - - $19,148 - - - - - - - -
-
kWh
-
-
kW-months/year
$19,148
-
$
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$328,492
Cost:
$533,278
$18,648 630,422 $676 154 $19,148 - $(-720) 554,000 $108,540 - $182,200 - $18,648
630,422
kWh
$676
154
kW-months/year
$19,148
-
$
$(-720)
554,000
lb
$108,540
-
$
$182,200
-
$
TOTAL IMPLEMENTED Savings:
$21,384
Cost:
$19,268
$19,698 665,885 $1,686 383 - - - - - - - - $19,698
665,885
kWh
$1,686
383
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Ancillary Material Cost